PROJECT DATA

Project Title:

ARMONIA Sea &Spa Resort

Client:

GÖKÇE EGE İNŞAAT ve TİCARET A.Ş.

Site Area:

19.750 m2

Built-up Area:

10.500 m2

Facilities:

190 Rooms, Lobby, Spa, Indoor & Outdoor Swimming Room, Main Restaurant, 4 Ala-cart Restaurants, Beach Club, Kids World

Start of Planning:

2009

Total Costs:

~20 Million EURO

Phase:

Submission

ARMONIA SEA&SPA

KADIKALESI / BODRUM

ARMONIA Sea & Spa Hotel lies in one of the Blue Flag beaches of the Bodrum Peninsula. An old Hellenistic castle and a small church are completing this charming location, which called as KADIKALESI in the outskirts of Turgutreis.

The heart of the facility is its lobby. The form of the building reminds an ancient galley. The masonry structure is out of stone and the large transparent opening on the west façade gives the guests the opportunity to enjoy the amazing sea view of the Aegean Sea.

This modern facility has a capacity of 190 rooms and 530 beds. Each building has a maximum length of 20 meters due to the local building regulations, so the rooms are placed in 12 different house blocks, which differs slightly. The room blocks are situated around the large-scaled main garden. Many of the rooms have sea-view. The garden design allows sunbathing for all guests.

Five different swimming pools are designed in the facility. The main swimming pool stretches over the garden area and reaches out to some special rooms. The Wellness & Spa area is a part of the main garden. The building becomes with its green roof a part of landscape and it is growing out of ground.  This facility includes different Turkish bath, steam bath, three saunas, swimming pool, beauty farm and fitness room.

A main restaurant surrounded with three different Ala-cart restaurants provides for a culinary experience. The guests can enjoy their dinner in the ala-cart restaurants having a sea view. In the upper part of the facility lies a conference hall with a capacity of 400 persons. A foyer and three meeting rooms complete the facility and gives. The hotel opening is planned in May 2017.